Planning a factory acceptance test
Prepare acceptance criteria, witness records and a close-out list before equipment is packed for export.
Identify the equipment under review
Put the order number, configuration revision, equipment identifier and inspection date at the top of the record. Agree who will witness the checks and who has authority to accept an item, request another check or authorize dispatch.
Write the criterion before the inspection
For each item, list the agreed requirement, the source document and how it will be checked. A configuration check might compare a supplied accessory with the signed scope. A process test also needs an agreed feed, duration, sampling method and assessment basis.
Record what the witness observed
Use separate columns for the criterion and the actual observation. Record the units and measurement conditions, and link the relevant photo, drawing, data record or witness-minute reference. If a check is deferred, record who must arrange it.
Keep a single open-item list
Give each deviation an identifier, an accountable party, a due date and a clear closure requirement. Follow-up evidence should point back to the original item so a buyer can see what changed.
Record the dispatch decision
Review outstanding items with the authorized parties. Record the decision, date, responsible person and any agreed conditions. Keep the equipment acceptance record, the packing list and the shipment release linked by the same reference.